- Projects
- TAM-Water Desalination plant 164K M3/Day
- Project Panels Design & Factory Test “34 automation panels”.
- Application Design and Programming (4 PLCs s7-300) with (16 RIO units).
- Network configuration (fiber optic converter - switches – Profinet - Profibus )
- Pressure, Level and Flow PID Programming and commissioning.
- Configuring and optimizing SCADA WinCC 7.4.
- Plant’s Daily Reports programming using visual scripts.
- ِhistorian servers.